Free course · Foundation · 6 lessons · about 90 minutes
Cost and management accounting for decision-making
A practical, self-paced course for accountants and finance managers in Indian manufacturing, trading and project (EPC) businesses. You will build a cost sheet, run break-even and variance numbers, absorb overheads, track a project to completion, and use relevant costs to answer the pricing, make-or-buy and shutdown questions management actually asks.
What you will be able to do
- Classify costs as direct or indirect, fixed or variable, and product or period, and prepare a cost sheet
- Calculate contribution, break-even, margin of safety and target-profit volumes
- Absorb overheads with predetermined rates and explain under- and over-absorption
- Compute and interpret material and labour variances against a standard cost
- Track a project with cost to complete and link it to percentage-of-completion revenue
- Apply relevant costing to special orders, make-or-buy, shutdown and limiting-factor decisions
Lesson 1: Cost concepts and the cost sheet
Every costing question, from “what does one unit cost?” to “should we take this order?”, starts with putting each rupee of cost in the right box. Get the classification right and the rest of the course becomes arithmetic.
Three ways to slice the same cost
| Classification | The question it answers | Example in a pipe factory |
|---|---|---|
| Direct vs indirect | Can we trace it to one product or job economically? | PVC resin is direct; the factory supervisor’s salary is indirect |
| Variable vs fixed | Does the total change when volume changes? | Resin and power for extruders are variable; factory rent is fixed |
| Product vs period | Does it sit in inventory, or hit profit in the period it is incurred? | Production costs go into inventory; selling and general admin costs are expensed |
These are independent. Factory electricity is usually indirect, largely variable and a product cost. A salesperson’s fixed salary is indirect, fixed and a period cost. Many costs are semi-variable (a fixed charge plus a usage charge, like a power bill with a demand charge): split them into the two parts before you use them.
Worked example: Sahyadri Pipes Pvt Ltd, one month
The company produced 10,000 units and sold 9,000 at ₹250 each.
| Line | Working | ₹ |
|---|---|---|
| Materials consumed | Opening 2,00,000 + purchases 12,00,000 − closing 3,00,000 | 11,00,000 |
| Direct wages | 4,00,000 | |
| Direct expenses (job-work charges) | 50,000 | |
| Prime cost | 11,00,000 + 4,00,000 + 50,000 | 15,50,000 |
| Factory overheads | 3,50,000 | |
| Add opening WIP, less closing WIP | 1,00,000 − 1,50,000 | (50,000) |
| Works (factory) cost | 15,50,000 + 3,50,000 − 50,000 | 18,50,000 |
| Production-related administration overheads | 1,50,000 | |
| Cost of production (10,000 units) | ₹200 per unit | 20,00,000 |
| Add opening finished goods | 1,000 units × ₹190 | 1,90,000 |
| Less closing finished goods | 2,000 units × ₹200 | (4,00,000) |
| Cost of goods sold (9,000 units) | 20,00,000 + 1,90,000 − 4,00,000 | 17,90,000 |
| Selling and distribution overheads | 2,10,000 | |
| Cost of sales | 17,90,000 + 2,10,000 | 20,00,000 |
| Sales | 9,000 × ₹250 | 22,50,000 |
| Profit | 22,50,000 − 20,00,000 | 2,50,000 |
Units check: opening 1,000 + produced 10,000 − closing 2,000 = 9,000 sold. Always reconcile units before rupees. Note that opening stock carries last month’s cost of ₹190, so cost of goods sold is not simply 9,000 × ₹200; your inventory method (FIFO or weighted average) decides which cost flows out first.
Cost records
Some companies must also maintain cost records, and some must have a cost audit, under section 148 of the Companies Act, 2013 and the Companies (Cost Records and Audit) Rules, 2014. Applicability depends on the industry and turnover thresholds. confirm whether your company is covered and the current thresholds with your cost auditor or CA.
Lesson check
Four questions. Get 3 right to complete the lesson. Your progress is saved in this browser.
Lesson 2: Marginal costing and cost-volume-profit
Management rarely asks “what does a unit cost?”. They ask “how many do we need to sell?” and “what happens if we cut the price?”. Marginal costing answers both in a few lines.
The idea
Split costs into variable and fixed. Each unit sold earns a contribution (selling price minus variable cost) towards fixed costs. Once fixed costs are covered, every further rupee of contribution is profit.
- Contribution per unit = selling price − variable cost per unit
- P/V ratio (contribution-to-sales ratio) = contribution ÷ sales
- Break-even units = fixed costs ÷ contribution per unit
- Break-even sales = fixed costs ÷ P/V ratio
- Margin of safety = actual or budgeted sales − break-even sales
- Profit = margin of safety (in ₹) × P/V ratio
Worked example: Narmada Valves Ltd
Selling price ₹500 per unit, variable cost ₹300 per unit, fixed costs ₹24,00,000 a year, budgeted sales 15,000 units, capacity 20,000 units.
| Measure | Working | Result |
|---|---|---|
| Contribution per unit | 500 − 300 | ₹200 |
| P/V ratio | 200 ÷ 500 | 40% |
| Break-even units | 24,00,000 ÷ 200 | 12,000 units |
| Break-even sales | 24,00,000 ÷ 40% (check: 12,000 × 500) | ₹60,00,000 |
| Budgeted sales | 15,000 × 500 | ₹75,00,000 |
| Margin of safety | 75,00,000 − 60,00,000 = 15,00,000; 15,00,000 ÷ 75,00,000 | ₹15,00,000 or 20% |
| Budgeted profit | 15,000 × 200 − 24,00,000 (check: 15,00,000 × 40%) | ₹6,00,000 |
| Units for a ₹10,00,000 profit | (24,00,000 + 10,00,000) ÷ 200 | 17,000 units |
What a 10% price cut really costs
Sales want to cut the price to ₹450. Contribution falls from ₹200 to ₹150, a 25% drop. Break-even rises to 24,00,000 ÷ 150 = 16,000 units. To keep the ₹6,00,000 profit, Narmada needs (24,00,000 + 6,00,000) ÷ 150 = 20,000 units: one-third more volume, and every unit of its capacity. A 10% price cut needs a 33% volume rise just to stand still. Put this table in front of anyone proposing a discount.
Marginal vs absorption profit
Under absorption costing, part of fixed production overhead is carried forward in closing stock. Under marginal costing, all fixed overhead is charged in the period. When closing stock rises, absorption profit is higher; when stock falls, marginal profit is higher. The difference is the change in stock × fixed overhead per unit. Statutory accounts use absorption; marginal costing is for internal decisions. If your monthly MIS profit swings while sales are flat, check whether stock build-up or run-down is moving fixed overhead between periods.
Limits of CVP
- Linear assumption: price and variable cost per unit are assumed constant. Volume discounts and overtime break this.
- Relevant range: fixed costs stay fixed only within a range. A second shift or a new warehouse steps them up.
- Sales mix: with several products, break-even depends on the mix. Use a weighted average P/V ratio and recompute when the mix moves.
Lesson check
Four questions. Get 3 right to complete the lesson. Your progress is saved in this browser.
Lesson 3: Overheads, absorption and activity-based costing
Overheads are often the largest cost that nobody owns. How you spread them decides which products look profitable, and a bad method can quietly push you to drop the wrong ones.
Three steps: allocate, apportion, absorb
- Allocate costs that belong wholly to one cost centre (the machining shop’s own supervisor).
- Apportion shared costs on a fair basis: rent by floor area, power by connected load or metered use, canteen by headcount. Then re-apportion service departments (stores, maintenance) to production departments.
- Absorb production department overhead into products using a rate per machine hour, labour hour or unit.
Predetermined rates and the year-end gap
Rates are set in advance from the budget, so products can be costed as they are made. At the year-end, overhead absorbed (actual hours × rate) will not equal overhead actually incurred.
Worked example: Kaveri Fabricators
| Machining | Assembly | |
|---|---|---|
| Budgeted overhead | ₹18,00,000 | ₹9,00,000 |
| Budgeted activity | 12,000 machine hours | 15,000 labour hours |
| Predetermined rate | 18,00,000 ÷ 12,000 = ₹150 per machine hour | 9,00,000 ÷ 15,000 = ₹60 per labour hour |
| Actual activity | 12,400 machine hours | 14,500 labour hours |
| Overhead absorbed | 12,400 × 150 = ₹18,60,000 | 14,500 × 60 = ₹8,70,000 |
| Actual overhead | ₹19,20,000 | ₹8,40,000 |
| Result | Under-absorbed ₹60,000 | Over-absorbed ₹30,000 |
Net, the factory has under-absorbed ₹30,000 (60,000 − 30,000): products were costed slightly too cheaply.
Treating the difference
- Small differences: write off to the costing profit and loss account for the period.
- Large differences from poor estimates: apportion them across closing WIP, finished goods and cost of sales with a supplementary rate, so each is stated at a realistic cost.
- Abnormal causes (a strike, a long breakdown, idle capacity): charge to profit and loss; never push them into stock.
Activity-based costing: the intuition
A single plant-wide rate assumes overhead is driven by volume. Much of it is not: set-ups, inspections, purchase orders and design changes are driven by complexity. Activity-based costing (ABC) groups overhead by activity and charges it using the driver of that activity.
Example: set-up cost is ₹6,00,000 for 120 set-ups, or ₹5,000 per set-up. The standard product runs 10,000 units in 20 set-ups; the custom product runs 2,000 units in 100 set-ups.
| Method | Standard (10,000 units) | Custom (2,000 units) |
|---|---|---|
| Per unit (6,00,000 ÷ 12,000 = ₹50) | ₹5,00,000, or ₹50 a unit | ₹1,00,000, or ₹50 a unit |
| ABC (₹5,000 per set-up) | 20 × 5,000 = ₹1,00,000, or ₹10 a unit | 100 × 5,000 = ₹5,00,000, or ₹250 a unit |
Volume-based costing makes the custom product look five times cheaper to set up than it is. That is how firms end up underpricing small, complex orders and overpricing their bread-and-butter lines. You do not need a full ABC system to benefit: apply the idea to your two or three biggest overhead pools.
Lesson check
Four questions. Get 3 right to complete the lesson. Your progress is saved in this browser.
Lesson 4: Standard costing and variance analysis
A standard cost tells you what a unit should cost. Variances tell you why it did not, and who should explain the difference.
Setting the standard
A standard has two parts for each input: a quantity (kg of material or hours of labour per unit, set with production and engineering) and a price or rate (set with purchase and HR). Use attainable standards that allow for normal wastage and downtime. Ideal standards that nobody meets produce variances that everybody ignores.
The four core variances
| Variance | Formula | Usually owned by |
|---|---|---|
| Material price | (Standard price − Actual price) × Actual quantity | Purchase |
| Material usage | (Standard quantity for actual output − Actual quantity) × Standard price | Production |
| Labour rate | (Standard rate − Actual rate) × Actual hours | HR, production planning |
| Labour efficiency | (Standard hours for actual output − Actual hours) × Standard rate | Production |
A positive answer is favourable (F), a negative one adverse (A). The key phrase is “for actual output”: always flex the standard to the units actually made.
Worked example: Godavari Castings
Standard per unit: 4 kg of material at ₹50 per kg (₹200) and 2 labour hours at ₹120 per hour (₹240). In March the plant made 1,000 units. It bought and used 4,200 kg at ₹48 per kg (₹2,01,600) and paid for 2,100 hours at ₹125 per hour (₹2,62,500).
Standard for actual output: material 1,000 × 4 = 4,000 kg × ₹50 = ₹2,00,000; labour 1,000 × 2 = 2,000 hours × ₹120 = ₹2,40,000.
| Variance | Working | ₹ |
|---|---|---|
| Material price | (50 − 48) × 4,200 | 8,400 F |
| Material usage | (4,000 − 4,200) × 50 | 10,000 A |
| Total material | 2,00,000 − 2,01,600 (check: 8,400 F − 10,000 A) | 1,600 A |
| Labour rate | (120 − 125) × 2,100 | 10,500 A |
| Labour efficiency | (2,000 − 2,100) × 120 | 12,000 A |
| Total labour | 2,40,000 − 2,62,500 (check: 10,500 A + 12,000 A) | 22,500 A |
Reading the story behind the numbers
Purchase bought material ₹2 per kg cheaper, a favourable price variance of ₹8,400. But the plant used 200 kg more than standard, costing ₹10,000. If the cheaper material came from a new supplier with poorer quality, the “saving” was really a ₹1,600 loss, plus any extra rejections. Variances interact: never praise or blame one in isolation.
On labour, both the rate and the hours were adverse. A common pattern: overtime at a premium rate to catch up after a breakdown, while the breakdown itself pushed hours up. If so, the root cause is maintenance, not the shop floor.
- Investigate by size and trend: set a threshold (for example 5% of standard or a rupee amount) and look at three-month trends, not single months.
- Price variance timing: many firms compute the material price variance when material is purchased, on the quantity bought, so stores are carried at standard. Be consistent.
- Revise standards when prices or methods change permanently; a stale standard turns every month into an “adverse” report.
Lesson check
Four questions. Get 3 right to complete the lesson. Your progress is saved in this browser.
Lesson 5: Job, contract and project costing
In an EPC or installation business each project is its own small company. If you cannot say today what a project will cost to finish, you cannot say what it has earned so far.
Job and contract costing in one paragraph
Each job or contract gets a cost code. Materials issued to site, site labour, subcontractor bills, equipment hire and site overheads are booked to that code, along with a share of head-office overhead if your policy allows. Materials returned from site or transferred to another project are credited. Retention money held back by the customer is still revenue earned: it is a receivable, not a cost saving.
The core report: cost to complete
Worked example: Greenline Sports Surfaces has a contract to build a synthetic turf football pitch for a school for ₹2.4 crore (₹2,40,00,000). The original budget was ₹1.92 crore, a 20% margin. At 31 March the project review shows:
| Cost head | Budget | Cost to date | Estimate to complete | Estimate at completion | Variance to budget |
|---|---|---|---|---|---|
| Turf, infill and base materials | 1,00,00,000 | 62,00,000 | 42,00,000 | 1,04,00,000 | 4,00,000 A |
| Civil subcontract (base and drainage) | 45,00,000 | 30,00,000 | 18,00,000 | 48,00,000 | 3,00,000 A |
| Installation labour | 25,00,000 | 10,00,000 | 16,00,000 | 26,00,000 | 1,00,000 A |
| Equipment and site overheads | 22,00,000 | 8,00,000 | 14,00,000 | 22,00,000 | Nil |
| Total (₹) | 1,92,00,000 | 1,10,00,000 | 90,00,000 | 2,00,00,000 | 8,00,000 A |
The estimate to complete is not “budget minus spent”. It is a fresh, bottom-up estimate by the project manager of what is still needed: remaining quantities, open purchase orders and subcontract balances, crew days. Here the expected margin has fallen from ₹48,00,000 to ₹40,00,000 (2,40,00,000 − 2,00,00,000).
Linking cost to revenue: percentage of completion
Under Ind AS 115, revenue on such a contract is usually recognised over time; under AS 7 (for companies not on Ind AS), on a percentage-of-completion basis. A common measure is cost-to-cost:
| Step | Working | ₹ |
|---|---|---|
| Stage of completion | 1,10,00,000 ÷ 2,00,00,000 | 55% |
| Revenue to date | 55% × 2,40,00,000 | 1,32,00,000 |
| Cost to date | 1,10,00,000 | |
| Profit to date | 1,32,00,000 − 1,10,00,000 (check: 55% × 40,00,000) | 22,00,000 |
| Billed to the customer to date | 1,20,00,000 | |
| Contract asset (unbilled revenue) | 1,32,00,000 − 1,20,00,000 | 12,00,000 |
If billing ran ahead of revenue, the excess would be a contract liability. Notice how the cost-to-complete estimate drives the profit: had the project manager kept the stale ₹1.92 crore budget, stage of completion would have been overstated and profit pulled forward.
- Exclude costs that do not show progress from the measure, for example turf rolls delivered to site but not yet laid, or wasted rework. Agree the treatment with your auditor.
- Loss-making contracts: if the estimate at completion exceeds the contract price, the whole expected loss is recognised at once. If the estimate to complete here rose to ₹1,40,00,000, total cost would be ₹2,50,00,000 and the ₹10,00,000 expected loss would be booked now.
- Variations and claims: include them in the contract price only when they are approved or highly likely to be accepted, not when they are merely submitted.
For tax, contract income is also computed on a percentage-of-completion basis under the income computation rules. confirm the current tax provisions for construction contracts, including under the Income-tax Act, 2025, with your CA.
Lesson check
Four questions. Get 3 right to complete the lesson. Your progress is saved in this browser.
Lesson 6: Using costing for decisions
The cost sheet tells you what happened. Decisions need a different question: which costs and revenues change if we choose this option? Those are the relevant costs, and they are often not the ones in the cost sheet.
What is relevant
- Relevant: future cash flows that differ between the options, including opportunity costs (what you give up by using a resource).
- Not relevant: sunk costs already spent, committed costs that will be paid anyway, and fixed overheads that are only reallocated, not saved.
1. Special order pricing
Narmada Valves (lesson 2) sells 15,000 units at ₹500 and has capacity for 20,000. Variable cost is ₹300. An export buyer offers ₹380 a unit for 3,000 units, needing special packaging of ₹40,000. Contribution = (380 − 300) × 3,000 = ₹2,40,000, less ₹40,000 = ₹2,00,000 extra profit. Fixed costs are covered already, so the order is worth taking, provided it does not use capacity needed by regular customers or tempt them to ask for the same price. In the long run, normal prices must cover full cost, including fixed costs and a return on capital.
2. Make or buy
A component costs ₹150 a unit to make: materials ₹60, labour ₹40, variable overhead ₹20 and allocated fixed overhead ₹30. A supplier quotes ₹130 for the 10,000 units needed.
| Option | Working | Relevant cost (₹) |
|---|---|---|
| Make (fixed overhead stays either way) | (60 + 40 + 20) × 10,000 | 12,00,000 |
| Buy | 130 × 10,000 | 13,00,000 |
The ₹150 full cost suggests buying, but the relevant cost of making is ₹120, so making is cheaper by ₹1,00,000. Now suppose the freed machine time could make another product earning ₹1,50,000 contribution. That is an opportunity cost of making: 12,00,000 + 1,50,000 = ₹13,50,000, against ₹13,00,000 to buy. Buying now wins by ₹50,000. Also weigh quality, lead times and supplier dependence.
3. Shutting a loss-making line
A trading branch reports sales ₹40,00,000, variable costs ₹30,00,000 and allocated fixed costs ₹14,00,000: a loss of ₹4,00,000. Only ₹6,00,000 of the fixed costs (branch rent, branch staff) would disappear on closure. Closing loses ₹10,00,000 of contribution and saves ₹6,00,000, so company profit falls by ₹4,00,000. The branch is covering ₹4,00,000 of head-office costs that would otherwise land elsewhere. Keep it, unless the space or capital has a better use.
4. Limiting factor
When one resource is short, rank products by contribution per unit of that resource, not per unit of product. Only 10,000 machine hours are available.
| Product A | Product B | |
|---|---|---|
| Contribution per unit | ₹300 | ₹200 |
| Machine hours per unit | 4 | 1 |
| Contribution per machine hour | ₹75 | ₹200 |
| Demand (hours needed) | 1,000 units (4,000 hours) | 8,000 units (8,000 hours) |
Demand needs 12,000 hours. Make B first: 8,000 units use 8,000 hours, earning ₹16,00,000. The remaining 2,000 hours make 500 units of A, earning ₹1,50,000. Total ₹17,50,000. Ranking by contribution per unit (A first) would give A 1,000 units (₹3,00,000) plus B 6,000 units with the remaining 6,000 hours (₹12,00,000): ₹15,00,000, which is ₹2,50,000 worse.
Lesson check
Four questions. Get 3 right to complete the lesson. Your progress is saved in this browser.
Final test and certificate
15 questions drawn from a bank, marked on the server. Score 11 or more (70%) for a certificate of completion with a public verification link and an “Add to LinkedIn” button.
Go to the final test- FEMA for importers
- Export compliance
- TDS and GST essentials
- Ind AS foundations
- Close and consolidation
- Internal controls and fraud
- FP&A essentials
- Corporate finance essentials
- Treasury and cash management
- Import procurement & SCF
- EPC projects and tenders
- Companies Act compliance
- Payroll compliance
- IFRS, US GAAP and Ind AS
- Excel for finance teams
- AI for finance teams
General information for learning, not professional advice. Laws, rates and standards change: confirm with the official source or your adviser before acting. Last reviewed 15 November 2026.